Electrical Components Packer: One Pad SKU Replaces Nine Foam Sizes
Customer: a packer serving electrical component distributors.

Product used: Kraft Paper Pad, 80 gsm, double layer, 14 x 40 cm stock size.
Result: nine foam insert sizes replaced by one pad SKU; 11 m² of rack space released.
The problem with nine sizes
The packer's nine foam inserts existed because each component tray had been fitted individually over the years. Each size meant: a stock line, a supplier MOQ, a min-max level, and the persistent failure mode of distribution centres running out of one size and substituting a near-miss — which is how two of the year's damage claims originated, in packs that were technically protected with the wrong insert.
The redesign question
Not "what pad fits each tray" but "what does the tray need". The answer, consistent across all nine: a dense, flat, slightly compressible layer between the component tray and the carton, plus perimeter fill. The foam's moulded shapes were doing location work that the trays themselves already did.
A single double-layer 80 gsm pad, 14 x 40 cm — one of our five stock lengths — covered base and perimeter duty across the range when folded once. Nine SKUs became one.
| Parameter | Specification |
|---|---|
| Material | Virgin kraft, 80 gsm |
| Construction | Double layer |
| Size | 14 x 40 cm (stock) |
| MOQ | 1,000 pieces |
The numbers
| Metric | Before (9 foam SKUs) | After (1 pad SKU) |
|---|---|---|
| Packaging SKUs held | 9 | 1 |
| Rack space | 14 m² | 3 m² |
| Substitution-related damage claims | 2/year | 0 |
| Pack time | 38 s | 31 s |
| Declared packaging material | Mixed foam | Paper |
The rack-space figure deserves its own line: foam inserts are bulky, ordered in volume to hit MOQs, and slow to turn over. Pads ship flat and dense. The 11 m² released was repurposed for finished goods, which is where the packer's constraint actually was.
What we would change next time
One component tray in the range — a 6 kg transformer unit — was marginal on the single-pad solution and now uses two pads. Identifying the heavy outlier before the switchover, rather than through one damaged shipment, would have cost an hour of spec review.
Data note: figures in this article are representative values from this application type, shown for specification guidance. Project-specific data is available under NDA on request.